Data centers & cable landing stations
Rack and cabinet structure, −48V DC power, fiber plant, grounding and access control — installed inside live, permitted facilities by CLS- and OSHA 30-certified crews out of Virginia Beach.
Most cage buildouts stall where trades hand off to each other. We self-perform structure, DC power, fiber, copper cabling, grounding, AC, backup power and access control — and we execute moves, adds and changes on infrastructure that is already live — so the sequence never waits on a second mobilization.
Four-post 19" cabinets set to drawing, anchored to slab with top support, seismic and non-seismic bracketing, ladder rack and overhead fiber raceway.
Battery and return feeders to 350MCM and 300A, BDFB and breaker panel builds, compression lugs, hand-laced cable, energized and hot work on production equipment under permit.
96F LC-LC multifiber placement, ODF trays and 36F OS2 modules, spillovers and drop-downs, OLTS and OTDR testing with a certified report and TIA-606-C labeling.
#6 AWG bonding conductors, irreversible compression H-taps, busbar terminations, continuity and resistance testing with recorded values.
EMT conduit, THHN pull, NEMA receptacles, cord reels and panel breakers — plus lighting level verification with instrument readings, horizontal and vertical.
Biometric readers, door controller panels, 1200 lb electromagnetic locks, request-to-exit and audible/visual alarms, integrated over encrypted OSDP v2.2. Perimeter fabric to slab-to-slab spec.
Utility-tie transformers, primary AC distribution, DC plant breakers to 600A, inverter cabinet installs and dedicated UPS panels that remove single points of failure — commissioned alongside the equipment manufacturer's field engineer.
Cat5e/Cat6 UTP runs between racks and to the MMR, terminated and tested to the same labeling discipline as the fiber plant.
Capacity upgrades, equipment relocations and breaker/PDU changes executed on energized circuits without taking the served equipment down.
SLTE cage buildout for a hyperscale network operator inside an operating Tier III carrier facility, delivered under a Feb 2026 statement of work as a subcontractor to the prime. Client names and site imagery are shared under NDA on request.
In a live facility, work that is not documented did not happen. Every crew we mobilize carries the certifications the site requires, and every scope closes with a package the operator can file.
The same five steps on every job, because operators approve crews, not promises.
Written MOP for the scope and its risk class, submitted for operator and client approval before anyone badges in.
Work permits filed to facility policy, escort scheduled, materials received and staged inside the cage.
Job safety analysis signed each shift, LOTO applied on any energized scope, hot work isolated and witnessed.
Work to issued drawings, with OLTS, OTDR, continuity, resistance and illumination readings captured as they are taken.
Redlined as-builts, labeled photo record, test reports and punch list walked with the client before demobilization.
Detail views from executed scopes. Facility identifiers and client circuit labels are withheld.












Photography by DDC Telecom Solutions on executed scopes. Additional project photography available under NDA.
Send a scope, a drawing set or a walk date. We respond with a labor breakdown, a schedule and the certifications your facility will ask for.
We can provide a capability statement, insurance certificates, W-9, safety program documentation and prequalification packages on request — typically within one business day.
Request the package